Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the forminator domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/intel133/public_html/wp-includes/functions.php on line 6114
If Power Fails, We Won't
December 4, 2024

ABOUT

Intellisys Power Controls Corporation as a Company was established in September 2011 by experienced and dedicated engineers in the power control industry and electrical switchgear manufacturing.
A 100% Filipino-owned company under LJT Group of Companies.
Throughout the years we have earned a reputation for unwavering quality, attention, top detail, and being the most reliable in product and service.
At IPCC, our engineering approach is based solely upon our customer’s individual needs, and specific requirements. More than 95% of our systems are custom designed.


download brochure/products and services


OUR PRODUCTS

OUR SERVICES